Showing 1 - 8 of 37
NASA SLS Artemis Rocket Space

Curtiss-Wright Congratulates NASA on Historic First Launch of the Space Launch System Rocket

Curtiss-Wright data acquisition units capture critical test flight data on the SLS rocket boosters, core stage, upper stage and the Orion crew module

11/16/2022
Curtiss-Wright Adds Link 22 Support to its Broad Range of Tactical Data Link Verification, Training and Simulation Solutions

Curtiss-Wright Adds Link 22 Support to its Broad Range of Tactical Data Link Verification, Training and Simulation Solutions

The new Link 22 capability seamlessly integrates with Curtis-Wright TCG TDL systems.

11/08/2022
Curtiss-Wright Congratulates AVIO and the European Space Agency on the Successful Inaugural Launch of the Vega-C Launcher

Curtiss-Wright Congratulates AVIO and the European Space Agency on the Successful Inaugural Launch of the Vega-C Launcher

Curtiss-Wright provides the telemetry data system used on the Vega-C Launcher.

07/20/2022
Boing OFT-2 Mission for CST-100 Starliner Spacecraft

Curtiss-Wright Congratulates NASA and Boeing on Successful Boeing OFT-2 Mission to the International Space Station

Boeing Orbital Flight Test-2 mission for Boeing’s CST-100 Starliner spacecraft supported by Curtiss-Wright data acquisition technology

05/27/2022
Industry News

Curtiss-Wright Honored to Host Tri-Service Open Architecture Interoperability Demonstration TIM & Expo

Curtiss-Wright has announced that it is serving in the honored role of Distinguished Host for the Tri-Service Open Architecture Interoperability Demonstration (TSOA-ID) TIM & Expo being held March 15 at the Solomons Inn Resort, Marina, MD.

03/15/2022
Curtiss-Wright Selected by John Cockerill Defense to Provide Turret Drive Servo System and Ammunition Loading System

Curtiss-Wright Selected by John Cockerill Defense to Provide Turret Drive Servo System and Ammunition Loading System

Contract to supply aiming and stabilization supporting the Cockerill 3105 series weapons system for Indonesia’s new Harimau Medium Weight Tank.

10/11/2021
Curtiss-Wright Introduces New Starter Kit System and 8-Slot OpenVPX Chassis to Speed Development of CMOSS/SOSA Technical Standard 1.0 Aligned Solutions

Curtiss-Wright Introduces New Starter Kit System and 8-Slot OpenVPX Chassis to Speed Development of CMOSS/SOSA Technical Standard 1.0 Aligned Solutions

New CMOSS/SOSA Technical Standard 1.0 aligned Starter Kit system integrates VICTORY Network, A-PNT and Intel® Xeon Processor SBC. 8-Slot CMOSS/SOSA Technical Standard 1.0 aligned 3U.

10/11/2021
Curtiss-Wright Receives Security Authorization from U.S. Air Force for Three Link 16 Software Products

Curtiss-Wright Receives Security Authorization from U.S. Air Force for Three Link 16 Software Products

TCG LinkPRO, TCG BOSS, and TCG GTS all earn placement on DoD’s OTI Evaluated/Approved Products List

09/14/2021