Showing 1 - 8 of 125
AD/MDC/105

Curtiss-Wright Adds Digital Temperature Compensation Pressure Scanner Module to KAM-500 Flight Test Instrumentation Family

New KAD/MDC/105 module supports dual 64-Channel DTC Pressure Scanners

04/09/2024
Leveraging High-Speed NVMe Storage for CSfC Encrypted Data-at-Rest

Leveraging High-Speed NVMe Storage for CSfC Encrypted Data-at-Rest

One way to take optimal advantage of the increased performance of the NVMe storage devices is to use an NVMe-based in-line hardware encryptor.

11/21/2023

Quality First

Engineers adopt different approaches to ensure data quality in aerospace testing. They employ best practice techniques to data acquisition and management to keep data accurate and results reliable.

07/25/2023
data acquisition

Miniature Network Data Acquisition & Encoding Product for Flight Test Applications Supports High Bus Rates

New MnACQ-2700 combines new high-speed data acquisition and continued compatibility with existing COTS modules.

04/20/2023
OEMs Target Cleaner, Greener Cabin Air Conditioning

OEMs Target Cleaner, Greener Cabin Air Conditioning

A new generation of cabin air conditioning systems is emerging, prompted by a focus on reliability, air quality and sustainability.

02/09/2023
NASA SLS Artemis Rocket Space

Curtiss-Wright Congratulates NASA on Historic First Launch of the Space Launch System Rocket

Curtiss-Wright data acquisition units capture critical test flight data on the SLS rocket boosters, core stage, upper stage and the Orion crew module

11/16/2022
Curtiss-Wright Adds Link 22 Support to its Broad Range of Tactical Data Link Verification, Training and Simulation Solutions

Curtiss-Wright Adds Link 22 Support to its Broad Range of Tactical Data Link Verification, Training and Simulation Solutions

The new Link 22 capability seamlessly integrates with Curtis-Wright TCG TDL systems.

11/08/2022
military fighter jet data at rest

Data at Rest Build vs. Buy: Lead Time

Should you build or buy network attached storage or network file servers for data at rest? We look at the build process from design to CSfC encryption and buy lead times.

10/18/2022