Showing 61 - 72 of 111
Regional Jet with Custom High Speed Data Acquisition Meets Tight FTI Deadlines

Regional Jet with Custom High Speed Data Acquisition Meets Tight FTI Deadlines

A flight test organization was tasked with instrumenting a new regional airliner to gather flight test data. Read about the solution Curtiss-Wright provided here.

09/20/2017
Successfully Instrumenting a Regional Jet for Flight Testing with a New Team

Successfully Instrumenting a Regional Jet for Flight Testing with a New Team

A major aircraft manufacturer needed to plan and operate a flight test campaign for a new regional airliner. Read about the solution Curtiss-Wright developed here.

08/16/2017
Space COTS Approach for New Launcher and Capsule

Space COTS Approach for New Launcher and Capsule

NASA needed to develop a space launch system and a manned capsule to replace its previous vehicles and to meet future plans for deep space exploration, and land people on Mars. Read about the solution Curtiss-Wright developed here.

08/09/2017
Submarine and Helicopter Sonar Suite Upgrades Mission Systems

Submarine and Helicopter Sonar Suite Upgrades Mission Systems

A European system developer needed to upgrade their sonar system. Read about the ITAR-free, CE, RoHS, and REACH compliant rugged solution Curtiss-Wright developed.

07/25/2017
Harnessing the Power of AltiVec in Modern COTS Applications

Harnessing the Power of AltiVec in Modern COTS Applications

A customer approached Curtiss-Wright requiring a radar processing tech refresh for their aging fleet of fast jets. Learn about the solution we developed here.

07/04/2017
Cockpit Modernization with Ethernet

Cockpit Modernization with Ethernet

A customer contacted Curtiss-Wright with the need to upgrade a fleet of tactical aircraft. Read about the solution we developed here.

06/02/2017
Reducing Development Time for High-Speed Embedded Data Collection

Reducing Development Time for High-Speed Embedded Data Collection

High-performance storage solution for use on UAV with a minimum of 1TB of secure storage capacity to capture and store data and video from a variety of sensors.

05/16/2017
Ship-to-Ship Communications Tech Refresh

Ship-to-Ship Communications Tech Refresh

A customer wanted to update their ship-to-ship communications system. Read about the solution Curtiss-Wright developed that saves them money, support hours, and allows them to use new technology with existing systems without added expense and time.

05/04/2017
The Bigger Picture for Radar Sub-systems

The Bigger Picture for Radar Sub-systems

A customer approached Curtiss-Wright to develop a Radar system, with high-performance FPGA processing and integration of other system function all wrapped up in a rugged system. Read about the solution we developed here.

04/10/2017
Small Launcher Development Flight Instrumentation Avionics Using Space COTS

Small Launcher Development Flight Instrumentation Avionics Using Space COTS

A developer of a small launcher sought a data acquisition solution that could endure harsh conditions, capture and transmit data during flight while also keeping costs to a minimum.

03/30/2017
Upgrade Airborne Radar within Power, Cost & Temp Constraints

Upgrade Airborne Radar within Power, Cost and Temp Constraints

To remain competitive, a Curtiss-Wright customer needed to upgrade an existing radar system that was deployed across multiple airborne platforms. A critical part of the upgrade was doubling the system’s signal processing throughput.

02/02/2017
Increasing Memory Capacity by 400% to Solve Sensor Fusion Challenges

Increasing Memory Capacity by 400% to Solve Sensor Fusion Challenges

Curtiss-Wright developed a solution that increased memory capacity by 400% to solve sensor fusion challenges. Read the full details here.

01/31/2017