Showing 17 - 24 of 148
![NPI-Axon-MEM-PR-image-no-Text NPI-Axon-MEM-PR-image-no-Text](/sites/default/files/styles/cards_listing_mobile/public/2023-06/NPI-Axon-MEM-PR-image-no-Text.jpg?itok=s63anwal)
New Axon Modules Are First to Enable Real-time FFT Processing of High-Speed Accelerometers and TEDS Onboard the Aircraft for Flight Test Programs
New Axon data acquisition modules lower the time required to complete a flight test campaign by maximizing the number of flight test points completed per flight.
06/13/2023
![Curtiss-Wright Awarded $24 Million Contract to Provide Flight Test Instrumentation Equipment for the F-35 Technology Refresh 3 Program Curtiss-Wright Awarded $24 Million Contract to Provide Flight Test Instrumentation Equipment for the F-35 Technology Refresh 3 Program](/sites/default/files/styles/cards_listing_mobile/public/2023-06/PR-Design-Win-F-35-DFTI-no-caption.jpg?itok=jSeCn9u6)
Curtiss-Wright Awarded $24 Million Contract to Provide Flight Test Instrumentation Equipment for the F-35 Technology Refresh 3 Program
Curtiss-Wright Corporation (NYSE: CW) today announced that it has been awarded a $24 million contract from Nellis Air Force Base to provide Flight Test Instrumentation (FTI) equipment in support of the F-35 Technology Refresh 3 (TR-3) program.
06/12/2023
![Avionics International Avionics International](/sites/default/files/styles/cards_listing_mobile/public/2023-03/fifty-Article-Avionics-Military-Require.png?itok=CioCcUyJ)
Open or Out: U.S. Military Requirements for Modular Open Systems Architectures
Now that the Army has chosen its preferred Future Long Range Assault Aircraft in Bell’s V-280 advanced tiltrotor, the race is on to populate it with mission systems that will allow the machine to operate through adversaries’ sophisticated air defense systems.
03/21/2023