Showing 9 - 16 of 88
Boing OFT-2 Mission for CST-100 Starliner Spacecraft

Curtiss-Wright Congratulates NASA and Boeing on Successful Boeing OFT-2 Mission to the International Space Station

Boeing Orbital Flight Test-2 mission for Boeing’s CST-100 Starliner spacecraft supported by Curtiss-Wright data acquisition technology

05/27/2022
MiTSPI nTTU-2600 Miniature Network TSPI Stack

Curtiss-Wright Introduces Miniature Network Tactical Time-Space Position Information System for Highly Accurate navigational, IMU, and GPS Data

New compact MiTSPI nTTU-2600 captures and records positional data for flight test, missile test, and hypersonics test programs

05/10/2022
Curtiss-Wright Displays and Demonstrates New Flight Test Instrumentation Hardware and Software Solutions at International Telemetering Conference 2021

Curtiss-Wright Displays and Demonstrates New FTI Hardware and Software Solutions at ITC 2021

Curtiss-Wright will showcase its newest FTI solutions, including TmNS compatible bi-directional RF communication and PCM backfill, a new compact and modular all-in-one telepack, and IADS post-test explorer, a purpose-built post-test reporting software.

10/25/2021
Curtiss-Wright Debuts “Supply Chain Proofed” Safety Certifiable Rugged Graphics Module for Airborne Platforms

Curtiss-Wright Debuts “Supply Chain Proofed” Safety Certifiable Rugged Graphics Module for Airborne Platforms

New V3-717 3U OpenVPX graphics processor module supports DO-254 DAL A and FACE-aligned software drivers with well-sourced, long proven AMD Radeon E8860 GPU.

10/21/2021
Curtiss-Wright Debuts Industry’s First Safety Certifiable OpenVPX SBC to Feature the NXP 16-Core Layerscape LX2160A Arm Processor

Curtiss-Wright Debuts Industry’s First Safety Certifiable OpenVPX SBC to Feature the NXP 16-Core Layerscape LX2160A Arm Processor

New V3-1708 SBC features 16-Core 64-bit Arm Cortex®-based module to deliver DO-254 DAL-A with FAA/EASA AC/AMC 20-152A compliance.

06/02/2021
Curtiss-Wright Flight Test Equipment Utilized During NASA's Space Launch System (SLS) Core Stage Test

Curtiss-Wright Flight Test Equipment Utilized During NASA's Space Launch System (SLS) Core Stage Test

Curtiss-Wright data acquisition units support SLS test data collection goal

04/06/2021
Curtiss-Wright to Supply SBB Swiss Federal Railways with Stabilization Technology for High-Speed Passenger Train

Curtiss-Wright to Supply SBB Swiss Federal Railways with Stabilization Technology for High-Speed Passenger Train

Curtiss-Wright’s new modular electromechanical train-tilting stabilization solution lowers life-cycle costs while improving passenger comfort.

03/17/2021
Curtiss-Wright Defense Solutions Honored by 2020 Military & Aerospace Electronics Innovators Awards

Curtiss-Wright Defense Solutions Honored by 2020 Military & Aerospace Electronics Innovators Awards

Curtiss-Wright honored with five Innovators Awards: three Gold for Parvus DuraMAR 6300, VPX3-673 Assured Position, Navigation and Timing (A-PNT) card, VME-1910 single board computer, and two Silver for ADSR-4003 Advanced Data Server and Recorder and GVDU LCD touchscreen Ground Vehicle Display Unit.

09/09/2020