Showing 9 - 16 of 151
Quad-A

Curtiss-Wright Showcases New Rugged MOSA-based Solutions and Live System Solution Demonstrations at Army Aviation Mission Solutions Summit

Presenting a wide range of high-performance processing, tactical battlefield communications, networking, secure data storage and machine/human-interface technology demonstrations at the Army Aviation Mission Solutions Summit, 2023.

04/26/2023
Avionics International

Open or Out: U.S. Military Requirements for Modular Open Systems Architectures

Now that the Army has chosen its preferred Future Long Range Assault Aircraft in Bell’s V-280 advanced tiltrotor, the race is on to populate it with mission systems that will allow the machine to operate through adversaries’ sophisticated air defense systems.

03/21/2023
Understanding GCIA

Understanding GCIA: A Paradigm Shift for Establishing an Overall Ground-combat Vehicle Architecture

The U.S. Army has long pursued a standardized infrastructure and architecture for ground-combat vehicle hardware and networking.

02/16/2023
The Next Generation of Open-systems Embedded Computing Standards

The Next Generation of Open-systems Embedded Computing Standards

The SOSA technical standard for embedded computing hardware and software is beginning to provide tangible benefits for early adopters.

01/25/2023
Rugged Computers Take on the Shock and the Heat

Rugged Computers Take on the Shock and the Heat

Designers of rugged embedded computing systems, laptop computers, and tablet computers balance the need to operate in harsh conditions, as well as meet growing requirements for open-systems standards.

01/09/2023
DoD’s MOSA Mandate Drives CMOSS Approach to A-PNT

DoD’s MOSA Mandate Drives CMOSS Approach to A-PNT

The U.S. Army’s Mounted Assured PNT System (MAPS) program was initiated to replace existing GPS receivers and antennas in most of the Army’s ground vehicle variants.

12/01/2022
Military & Aerospace Electronics

Thermal-Management Techniques Take-on the Heat

It's nearly impossible to use power efficiently enough to eliminate waste heat altogether. Enhancing efficiency can help reduce waste heat -- but only to a degree.

10/27/2022
military fighter jet data at rest

Data at Rest Build vs. Buy: Lead Time

Should you build or buy network attached storage or network file servers for data at rest? We look at the build process from design to CSfC encryption and buy lead times.

10/18/2022