Showing 1 - 8 of 39
Curtiss-Wright Addresses High Voltage Power Requirements for U.S. Ground Vehicles with High Voltage Turret Drive System

Curtiss-Wright Addresses High Voltage Power Requirements for U.S. Ground Vehicles with High Voltage Turret Drive System

High Voltage Turret Drive Stabilization System (HV TDSS) converts, stores, controls 28V source power up to 750V.

10/09/2023
New High Voltage Turret Drive System Delivers 750V Peak Power to Accelerate High Inertia Loads

New High Voltage Turret Drive System Delivers 750V Peak Power to Accelerate High Inertia Loads

High Voltage Turret Drive Stabilization System (HV TDSS) converts, stores, controls 28V source power to 750V without increasing SWaP-C.

09/11/2023
NASA SLS Artemis Rocket Space

Curtiss-Wright Congratulates NASA on Historic First Launch of the Space Launch System Rocket

Curtiss-Wright data acquisition units capture critical test flight data on the SLS rocket boosters, core stage, upper stage and the Orion crew module

11/16/2022
Curtiss-Wright Congratulates AVIO and the European Space Agency on the Successful Inaugural Launch of the Vega-C Launcher

Curtiss-Wright Congratulates AVIO and the European Space Agency on the Successful Inaugural Launch of the Vega-C Launcher

Curtiss-Wright provides the telemetry data system used on the Vega-C Launcher.

07/20/2022
Boing OFT-2 Mission for CST-100 Starliner Spacecraft

Curtiss-Wright Congratulates NASA and Boeing on Successful Boeing OFT-2 Mission to the International Space Station

Boeing Orbital Flight Test-2 mission for Boeing’s CST-100 Starliner spacecraft supported by Curtiss-Wright data acquisition technology

05/27/2022
Curtiss-Wright Debuts Fully Rugged Cisco IOS-XE Network Appliance/Backbone that Combines Network Router and Switch for Military and Aerospace Applications

Curtiss-Wright Debuts Rugged Cisco IOS-XE Network Appliance/Backbone that Combines Network Router and Switch

High-performance router + switch integrates secure Cisco ESR-6300 embedded services router (ESR) and ESS-3300 embedded services switch (ESS) technology into single SWaP-optimized ultra-rugged chassis.

08/19/2021
Curtiss-Wright Flight Test Equipment Utilized During NASA's Space Launch System (SLS) Core Stage Test

Curtiss-Wright Flight Test Equipment Utilized During NASA's Space Launch System (SLS) Core Stage Test

Curtiss-Wright data acquisition units support SLS test data collection goal

04/06/2021
New 10 GbE Switch Module Delivers 10x Performance Increase for Curtiss-Wright’s PacStar Modular Data Center

New 10 GbE Switch Module Delivers 10x Performance Increase for Curtiss-Wright’s PacStar Modular Data Center

New PacStar 448 10 GigE Switch delivers a 10x transmission speed boost to support hyper-converged infrastructure, cloud replication, and high-speed network-based tactical communications at the edge of the battlefield.

02/24/2021