How Mission System Architecture Choices Affect SWaP
The challenge of fitting all the mission system electronics on-board SWaP-constrained military vehicles, while meeting reliability and schedule constraints.
The Technical Challenges of Developing Effective and Reliable A-PNT Solutions
David Jedynak looks at some of the technical challenges involved in developing effective and reliable Assured Position, Navigation and Timing (A-PNT) solutions.
A Fully Integrated COTS Approach for PNT to Ground Vehicles in GPS-Denied Environments
Explore new deployed approaches for detecting threats to GPS and providing position, navigation, and timing (PNT) information to the warfighter in GPS-denied environments.
Curtiss-Wright Expands Space COTS Capabilities Through Licensing Agreement with Réaltra
The new licensing agreement with Réaltra will complement existing activity for the Curtiss-Wright Acra KAM-500 range of Space COTS radiation-tolerant products into space applications.