Showing 1 - 8 of 90
Curtiss-Wright Addresses High Voltage Power Requirements for U.S. Ground Vehicles with High Voltage Turret Drive System

Curtiss-Wright Addresses High Voltage Power Requirements for U.S. Ground Vehicles with High Voltage Turret Drive System

High Voltage Turret Drive Stabilization System (HV TDSS) converts, stores, controls 28V source power up to 750V.

10/09/2023
New High Voltage Turret Drive System Delivers 750V Peak Power to Accelerate High Inertia Loads

New High Voltage Turret Drive System Delivers 750V Peak Power to Accelerate High Inertia Loads

High Voltage Turret Drive Stabilization System (HV TDSS) converts, stores, controls 28V source power to 750V without increasing SWaP-C.

09/11/2023
Curtiss-Wright Awarded Contract by U.S. Navy for MOSA Computer Modules to Support Identification Friend or Foe RADAR System

Curtiss-Wright Awarded Contract by U.S. Navy for MOSA Computer Modules to Support Identification Friend or Foe RADAR System

Contract valued in excess of $8.7M to support AN/UPX-24(V) IFF Processing electronics.

02/08/2023
Curtiss-Wright Selected to Deliver MOSA Networking and Safety Certifiable Processing and Graphics Solutions for Aircraft Upgrade Program

Curtiss-Wright Selected to Deliver MOSA Networking and Safety Certifiable Processing and Graphics Solutions for Aircraft Upgrade Program

Rugged COTS processing and graphics display modules provided with AC 20-152A safety certification artifacts that support system certification up to DAL-A.

01/31/2023
NASA SLS Artemis Rocket Space

Curtiss-Wright Congratulates NASA on Historic First Launch of the Space Launch System Rocket

Curtiss-Wright data acquisition units capture critical test flight data on the SLS rocket boosters, core stage, upper stage and the Orion crew module

11/16/2022
Curtiss-Wright Congratulates AVIO and the European Space Agency on the Successful Inaugural Launch of the Vega-C Launcher

Curtiss-Wright Congratulates AVIO and the European Space Agency on the Successful Inaugural Launch of the Vega-C Launcher

Curtiss-Wright provides the telemetry data system used on the Vega-C Launcher.

07/20/2022
Boing OFT-2 Mission for CST-100 Starliner Spacecraft

Curtiss-Wright Congratulates NASA and Boeing on Successful Boeing OFT-2 Mission to the International Space Station

Boeing Orbital Flight Test-2 mission for Boeing’s CST-100 Starliner spacecraft supported by Curtiss-Wright data acquisition technology

05/27/2022
Curtiss-Wright Displays and Demonstrates New Flight Test Instrumentation Hardware and Software Solutions at International Telemetering Conference 2021

Curtiss-Wright Displays and Demonstrates New FTI Hardware and Software Solutions at ITC 2021

Curtiss-Wright will showcase its newest FTI solutions, including TmNS compatible bi-directional RF communication and PCM backfill, a new compact and modular all-in-one telepack, and IADS post-test explorer, a purpose-built post-test reporting software.

10/25/2021