Showing 33 - 40 of 79
Curtiss-Wright Preparing for Moon & Mars Missions

Curtiss-Wright Preparing for Moon & Mars Missions

Curtiss-Wright is working with NASA and aerospace leaders to return Americans to the Moon and send astronauts to Mars in the early 2030s

02/14/2019
black box airplane

Meeting the Latest Regulations and Increasing Safety

New flight recorder system from Honeywell and Curtiss-Wright enhances safety and eases access to onboard data for operators.

02/07/2019
f-35 Power Architecture

Filling the Power Architecture Void: What’s Next?

Power Architecture processing units maintain their reliability and performance levels in systems deployed in harsh environments.

01/07/2019
Curtiss-Wright Enhances Industry-Leading ARMv8-Based Ultra-Small Mission Computer with SEU Resilient, Extended Operating Temp NVIDIA® Jetson™ TX2i®

Curtiss-Wright Enhances Armv8-Based USFF Mission Computer with SEU Resilient, Extended Operating Temp NVIDIA Jetson TX2i

Curtiss-Wright’s Defense Solutions division enhanced the Parvus DuraCOR 312, the industry’s most powerful and flexible ultra-small form factor (USFF) mission computer, with the NVIDIA Jetson TX2i module.

10/09/2018
Curtiss-Wright Demonstrates Cost-Effective, Fully Integrated A-PNT Solution for Ground Vehicles in GPS-denied Environments at AUSA 2018

Curtiss-Wright Demonstrates Cost-Effective, Fully Integrated A-PNT Solution for Ground Vehicles in GPS-denied Environments at AUSA 2018

SWaP-optimized COTS-based Digital Beachhead VICTORY-compliant network switch adds Complementary Assured Position, Navigation and Timing (A-PNT) services to ease modernization of ground vehicles.

10/08/2018
Curtiss-Wright Defense Solutions Sponsors the 2018 Intel Federal Summit

Curtiss-Wright Defense Solutions Sponsors the 2018 Intel Federal Summit

Curtiss-Wright Defense Solutions Sponsors the 2018 Intel Federal Summit

10/04/2018
Curtiss-Wright Spotlights its COTS-based VICTORY Services and Mounted Assured-Positioned Navigation Timing (A-PNT) Solutions at GVSETS 2018

Curtiss-Wright Spotlights its COTS-based VICTORY Services and Mounted Assured-Positioned Navigation Timing (A-PNT) Solutions at GVSETS 2018

Curtiss-Wright will present a paper on “Next Generation Open Standard Vehicle Electronics Architecture” and highlight Industry Leading Ground Vehicle.

08/07/2018
space launch system

Putting Data Acquistion Units on a Diet for Small Launcher Applications

We look at how ruggedized Data acquisition units, used in aerospace flight test, can provide a low cost solution for some space mission systems.

08/03/2018