Showing 1 - 8 of 143
Small Form Factor Mission Computer Delivers Multi-Core Workstation-Class Compute Power for SWaP-Sensitive Deployed Applications

Small Form Factor Mission Computer Delivers Multi-Core Workstation-Class Compute Power for SWaP-Sensitive Deployed Applications

New trusted and secure Parvus DuraCOR 8044 brings Intel® Xeon® W 8-Core processing in ultra-rugged design to air, ground and maritime platforms

02/06/2024
Rugged SOSA-aligned 6U VPX Embedded Computing Module Introduced by Curtiss-Wright

Rugged SOSA-aligned 6U VPX Embedded Computing Module Introduced by Curtiss-Wright

The CHAMP-XD4 features dual Intel Xeon D-2700 processors, and is for demanding intelligence, surveillance and reconnaissonce (ISR) system architectures.

01/02/2024
Leveraging High-Speed NVMe Storage for CSfC Encrypted Data-at-Rest

Leveraging High-Speed NVMe Storage for CSfC Encrypted Data-at-Rest

One way to take optimal advantage of the increased performance of the NVMe storage devices is to use an NVMe-based in-line hardware encryptor.

11/21/2023
The Future of High-Performance Embedded Computing

The Future of High-Performance Embedded Computing

Much of the innovation in high-performance embedded computing starts with microprocessors.

10/24/2023
100-Gigabit Ethernet Done Right

100-Gigabit Ethernet Done Right

COTS suppliers have focused on increasing connectivity speeds within and between systems for decades, following the introduction of the VPX standard.

08/31/2023
Curtiss-Wright Adds Link 22 Support to its Broad Range of Tactical Data Link Verification, Training and Simulation Solutions

Curtiss-Wright Adds Link 22 Support to its Broad Range of Tactical Data Link Verification, Training and Simulation Solutions

The new Link 22 capability seamlessly integrates with Curtis-Wright TCG TDL systems.

11/08/2022
Military & Aerospace Electronics

Thermal-Management Techniques Take-on the Heat

It's nearly impossible to use power efficiently enough to eliminate waste heat altogether. Enhancing efficiency can help reduce waste heat -- but only to a degree.

10/27/2022
military fighter jet data at rest

Data at Rest Build vs. Buy: Lead Time

Should you build or buy network attached storage or network file servers for data at rest? We look at the build process from design to CSfC encryption and buy lead times.

10/18/2022