Open or Out: U.S. Military Requirements for Modular Open Systems Architectures
Now that the Army has chosen its preferred Future Long Range Assault Aircraft in Bell’s V-280 advanced tiltrotor, the race is on to populate it with mission systems that will allow the machine to operate through adversaries’ sophisticated air defense systems.
SAVE this Space: Defining the C5ISR Space for Army Vehicles
To lower the cost and help speed the pace of technology upgrades for C5ISR [command, control, computers, communications, cyber, intelligence, surveillance, and reconnaissance] systems on Army vehicles, the U.S. Army’s Program Executive Officer (PEO) for Ground Combat Systems (GCS) has issued an Interface Description Document (IDD).
Simplifying the Integration of Assured PNT with CMOSS/SOSA Aligned Solutions
From a design and engineering perspective, there are many moving parts to consider and combine in order to arrive at a position, navigation, and timing (PNT) truth. In addition, solutions must be easy to integrate into the available space on existing platforms, whether they are unmanned aerial systems (UASs) or other aircraft, ground-based operations, or systems at sea.