Showing 17 - 24 of 242
Curtiss-Wright Selected to Deliver MOSA Networking and Safety Certifiable Processing and Graphics Solutions for Aircraft Upgrade Program

Curtiss-Wright Selected to Deliver MOSA Networking and Safety Certifiable Processing and Graphics Solutions for Aircraft Upgrade Program

Rugged COTS processing and graphics display modules provided with AC 20-152A safety certification artifacts that support system certification up to DAL-A.

01/31/2023
The Next Generation of Open-systems Embedded Computing Standards

The Next Generation of Open-systems Embedded Computing Standards

The SOSA technical standard for embedded computing hardware and software is beginning to provide tangible benefits for early adopters.

01/25/2023
Rugged Computers Take on the Shock and the Heat

Rugged Computers Take on the Shock and the Heat

Designers of rugged embedded computing systems, laptop computers, and tablet computers balance the need to operate in harsh conditions, as well as meet growing requirements for open-systems standards.

01/09/2023
Trusted Computing for National Defense

Trusted Computing for National Defense

Cyber security enters the realm of zero trust, as military forces seek to safeguard sensitive military technologies from enemy cyber hackers and spoofers.

12/21/2022
The Raspberry Pi SWaP-C Revolution: Driving Battlefield IoT

The Raspberry Pi SWaP-C Revolution: Driving Battlefield IoT

For size, weight, power, and cost (SWaP-C)-constrained applications, a military-grade Raspberry Pi-based mission computer defines a whole new class of solution for intelligence and connectivity at the tactical edge.

12/01/2022
DoD’s MOSA Mandate Drives CMOSS Approach to A-PNT

DoD’s MOSA Mandate Drives CMOSS Approach to A-PNT

The U.S. Army’s Mounted Assured PNT System (MAPS) program was initiated to replace existing GPS receivers and antennas in most of the Army’s ground vehicle variants.

12/01/2022
Secure Mesh Wireless Networks Drive Command Post Mobility

Secure Mesh Wireless Networks Drive Command Post Mobility

For years, the goal of our armed forces has been mobility at the command post, with Army leaders setting the standard to be able to move hourly, with the command post’s network ready, powered up and receiving in five minutes.

11/30/2022
NASA SLS Artemis Rocket Space

Curtiss-Wright Congratulates NASA on Historic First Launch of the Space Launch System Rocket

Curtiss-Wright data acquisition units capture critical test flight data on the SLS rocket boosters, core stage, upper stage and the Orion crew module

11/16/2022